Recent Comments

Archives

Recent Comments

Archives

Saltburn Cliff Lift

The cliff lift is one of the world’s oldest water-powered cliff lifts (the oldest being the Bom Jesus funicular in Braga, Portugal). The Saltburn tramway, as it is known, replaced a vertical lift, which was closed on safety grounds in 1883. The cliff tramway opened a year later and provided transport between the pier and the town. The railway is water-balanced and since 1924 the water pump has been electrically operated. The first major maintenance was carried out in 1998, when the main winding wheel was replaced and a new braking system installed. In more recent times there have been problems which hopefully are now overcome.

Image courtesy of a supporter of the Archive.

Leave a Reply

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

  

  

  

This site uses Akismet to reduce spam. Learn how your comment data is processed.